A few of the projects I've completed were not photo documented. Primarily because I just didn't think of it. Here's a short list of the completed projects....
- Replaced all potable water lines.
- Removed Hand Operated fresh water faucet in galley. It was no longer functional and will be replaced at some point.
- Removed midship water tank (under Stbd Settee). The tank was cracked and a replacement would need to be custom made, at a HIGH cost. I opted to delete it entirely and use the extra space for stowage.
- Bow water tank (under V-berth) was removed, cleaned and a new access port was installed.
- Stern water tank (under aft bunk) was removed, cleaned and a new access port was installed.
- Removed Staysail Boom or "Club Foot". The device serves no purpose other than to be in the way.
- Replaced head.
- Replaced Impeller (spare onboard as well).
- Installed Fuel gauge at Nav Station.
- Replaced water tank vents, fuel tank vent and holding tank vent (all located on the transom).
- Re-bedded water fill thru-deck fittings.
- Re-bedded diesel and waste thru-deck fittings.